Abstract
The structure and fabrication methods of the ITER vacuum vessel (VV) have been investigated and defined by the ITER International Team (IT). However, some of the current technical specifications are difficult to be achieved from the manufacturing point of view. To solve such an issue, this paper proposes an alternative specification of the VV to the IT's design. A series of the fabrication and assembly procedures for the mock-up are presented, together with candidates of welding configurations. Finally, the paper summarizes the results of mock-up fabrication, such as non-destructive examination of weld lines, obtained welding deformation and issues revealed from the fabrication experience. Based on the results, it is suggested that several issues such as clarification of conditions of repair welding, demonstration of welding distortion control and detectability/localization of internal defects should be solved before manufacturing the ITER VV.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.