Abstract

ABSTRACTThe Southeastern Anatolia Project (Güneydoğu Anadolu Projesi, GAP) was initiated in the 1970s to produce energy and irrigate arid lands through constructing dams and hydroelectric power plants on the Euphrates and Tigris rivers and extensive irrigation networks in southeastern Turkey. Over time, the project was expanded to achieve a wider range of goals in different fields and radically transform Southeastern Anatolia Region. It is also widely claimed that GAP was initiated to address the root causes of the Kurdish question in Turkey and that security considerations and political calculations were actually the raison d’être of GAP. However, this supposed link between GAP and the Kurdish question was often established in a simplistic manner and the question how these two have been related – or not – remained largely untangled. This article aims to fill this research gap and examine the complex and multi-dimensional nature of the interrelationship between GAP and the Kurdish question based on diverse primary and secondary data sources. Accordingly, the article identifies and discusses major narratives in which GAP was conceived as a political and strategic ‘anti-Kurdish’ plot; remedy for the conflict; and totally technical non-political project and presents an alternative and more accurate perspective on how to interpret this relationship.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call