Abstract

In this paper, we proposed a model for an inventory system that satisfies a continuous time-varying demand for a finished product over a known and finite planning horizon by supplying both new and repaired items. New items are fabricated from a single type of raw material procured from external suppliers, while used items are collected from the customers and then repaired to a condition that is as-good-as-new. During each time interval, new items and used items are produced from multiple production and repair runs. The problem is to determine a joint policy for raw materials procurement, new items fabrication, and used items repair such that the total relevant cost of the model is minimized. We also proposed a numerical solution procedure and we tested the model with some numerical examples and a simple sensitivity analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.