Abstract

This paper outlines a process planning strategy for a multi-axis hybrid manufacturing process that includes a metal deposition system and a multi-axis CNC machining system to rapidly manufacture precision metal parts. Different from the current layered manufacturing processes of which build direction is fixed throughout the process, the orientation of the part can affect the non-support buildability in the multi-axis hybrid manufacturing process. However, each orientation that satisfies the buildability and other constraints may not be unique. In this case, the final optimal orientation is determined based on build time. The build time computation algorithm for multi-axis hybrid system is presented in this paper. To speed up the exhaustive search for the optimal orientation, a multi-stage algorithm is developed to reduce the search space. A case study is used as an example to show the process planning strategy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.