Abstract

AbstractAdjacent vertical members in tall buildings undergo differential time‐dependent deformations due to creep and shrinkage. These deformations result in differential deflections at floor levels and redistribution of forces. An available practical procedure in the literature to estimate these deformations, taking into account the sequential nature of the loading, utilizes the rate of creep method (RCM) to evaluate the stress transfer between concrete and steel. This procedure is designated as Procedure(RCM) and is prone to errors since the creep recovery of concrete is neglected in RCM. A more accurate procedure designated as Procedure(AEMM) using the age‐adjusted effective modulus method (AEMM) as a stress transfer method, and taking into account the sequential nature of the loading, is proposed. The proposed procedure is more accurate than Procedure(RCM) since creep recovery of concrete is considered in AEMM. Numerical studies are carried out in this paper to compare the results from these two procedures. Copyright © 2007 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.