Abstract

A probabilistic methodology is presented, conceived to assist electric system planning engineers in the selection of the distribution substation locations, taking into account the hourly load changes or the daily load cycle. The hourly load centers for each of the different hourly load scenarios are calculated deterministically. These location points, properly weighted according to their correspondent load magnitude, are used to calculate the best fit probability distribution. This distribution is used to determine the maximum likelihood perimeter of the area where the substation should preferably be located. Results are presented and discussed for the application of the methodology to a real case, assuming three different bivariate probability distributions: the Gaussian distribution, a bivariate version of Freund's exponential distribution, and the Weibull probability distribution.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.