Abstract
Accurate load forecasting is a critical step for power system generation planning. Contingency parameters of the system and their dynamic characteristics should be taken into account for the purpose of load forecasting. In this paper, a probabilistic load forecasting algorithm considering contingency parameters is developed for the peak load forecasting. Using the chi-square distribution test and historical data, the probabilistic distribution of contingency parameters can be determined. In a case study, the Monte Carlo simulation is run to forecast load demand and generation scenarios of Bangladesh based on the developed adaptive algorithm and the calculated probabilistic distribution. The influence of contingency parameters is evaluated using a Bayesian network in a sensitivity study.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Canadian Journal of Electrical and Computer Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.