Abstract

Complex systems often experience a long period of incubation before accidents occur. Therefore, a proactive risk assessment is essential for process safety. The conventional job hazard analysis (JHA) method has been an effective tool to conduct a process risk assessment in the high-risk industrial field. However, the conventional JHA is inadequate for the proactive risk assessment since it is usually conducted during and before one specific operation process. Operations such as startup and maintenance are performed repeatedly on the lifecycle of a plant. Therefore, the risk reduction measures for the industrial process should include not only preventive actions obtained from the conventional JHA but also recovery ones. Resilience engineering (RE) has proven to be helpful for the recovery analysis of a complex system. The objective of this paper is to propose a proactive and comprehensive process risk assessment approach based on JHA and RE. The mechanism of applying RE to address operation process risk is illustrated. The integrated approach can provide guidelines to establish proactive risk reduction measures as well as maintain a low-risk level. Finally, a gas transmission startup process risk assessment case is presented to demonstrate its applicability.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.