Abstract

For a container terminal system, efficient yard crane (YC) schedules have great impact on the improvement of both operation efficiency and customer satisfaction. In this paper we address yard crane problem with uncertainties of vessels or trucks arrival time and container handling time. Vessels and trucks arrive dynamically with different service priorities and total number of handling containers is allowed to be changeable on current recording, adding more flexibility to the terminal system. A mixed integer programming model is proposed, and a simulation based Genetic Algorithm (GA) search procedure is applied to generate robust YC schedule proactively. Computational experiments are conducted to show the satisfied performance of our development method under uncertainty.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.