Abstract

Conventional alarm systems tend to overwhelm operators during a transient because of a large number of nearly simultaneous annunciator activations with varying degrees of relevance to operator tasks. Thus alarm processing techniques have developed to support operators in coping with the volume of alarms, to identify which alarms are significant, and to reduce the need for operators to infer the plant conditions. This paper proposes a proactive alarm reduction method for SMART (System-integrated Modular Advanced ReacTor) whereby based on the contents of the past operating effects alarm reduction is carried out during the next transient. We designed and implemented the proactive alarm reduction system and constructed the environment for the human factors validation test. Also, eight subjects actually working in a nuclear power plant (NPP) tested the practical effectiveness of the proposed proactive alarm reduction method according to the procedure of human factors validation test under a dynamic simulation of a partial scope for an NPP.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call