Abstract

This article considers when preventive maintenance (PM) and replacement should be implemented for a repairable series system with failure interaction. Under the main assumption that the system gradually deteriorates with time, the modified sequential method is proposed to determine an optimal PM and replacement policy for the system based on minimizing expected cost per unit operation time. According to this method, PM epochs are determined one after the other, and consequently we can make use of all previous information on the system's operation process. Also, the replacement epoch depends on the PM's effective length. A property of the cost function with respect to both PM and replacement is discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.