Abstract
Project and study overview Vinton Dome project collaboration between AGL (U of H) and Output Exploration. Salt dome onshore Louisiana (first well drilled in 1901). Simultaneous acquisition of 3D surface seismic data and 3D, 3C VSP data (Constance et al., 1999).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.