Abstract

A previous paper 1 described the design of a simulation model. This model, written in GASP IV, allows the management of a large machine shop to try out policies under realistic assump tions without disrupting operations. This paper outlines the results of approximately 30 "runs" on the model, which are designed to provide an insight into the ef fects of modifying the batch sizes used in the machine shop. The results obtained suggest that the major impact of increased batch sizes is on the flow of work through the plant. The overall conclusion is that the current manufacturing system cannot ac commodate larger batch sizes. The presently used batch sizes suit the configuration of work centres and the deployment of labour in the job shop.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.