Abstract

In this paper, a predictive maintenance method for maintenance sequence planning problem of series-parallel systems is proposed, which minimizes the system maintenance cost based on the opportunity maintenance. Firstly, the influence relationship diagram is established by considering the topological structure relationship and the function influence relationship. Secondly, with the condition monitoring information of each equipment, the predictive maintenance strategy and optimal maintenance sequence of series-parallel system are presented dynamically by combining the method of life time prediction and maintenance planning. Finally, a splice assembly production line is taken as an example to validate the reasonableness and economy of predictive maintenance strategy. This method can reduce the failure rate and shorten the total downtime to improve the reliability of equipment and profitability of enterprises.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.