Abstract

This paper proposed a practical construction technology for the supporting system of covered excavation of deep foundation pit enclosure structure in urban subway. With the proposed method, the optimal management of the construction process was carried out in order to alleviate the construction difficulty, and a relative fast construction process was implemented. Finally, the proposed method was successfully applied to the construction of a practical metro station.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.