Abstract
The operations of take-off and landing at hub airports are often subject to a wide variety of delays; the effects of these delays impact not only the related stakeholders, such as aircraft operators, air-traffic control unity and ground handlers but as part of the European network, delays are propagated through the network. As a result, Airport Collaborative Decision Making (A-CDM) is being employed as a methodology for increasing the efficiency of Air Traffic Management (ATM), through the involvement of partners within the airports. Under CDM, there are some strategic common objectives regardless the airport or the partner specific interest to improve operational efficiency, predictability and punctuality to the ATM network and airport stakeholders. Monitoring and controlling some strategic areas such as, Efficiency, Capacity, Safety and Environment is needed to achieve the benefits. Therefore, the present work aims to provide a framework to monitor the accuracy of capacity in the three main flight phases. It aims to provide a comprehensible and practical approach to monitoring capacity by identifying and proposing Key Performance Indicators (KPIs) based on the A-CDM Milestone Approach to optimise the use of available capacity. To illustrate our approach, Amsterdam Airport Schiphol is used as case study as a full A-CDM airport.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: Aerospace
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.