Abstract

This paper considers the no-wait scheduling of n jobs, where each job is a chain of unit processing time operations to be processed alternately on two machines. The objective is to minimize the mean flow time. We propose an O(n6)-time algorithm to produce an optimal schedule. It is also shown that if zero processing time operations are allowed, then the problem is NP-hard in the strong sense.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.