Abstract

This paper addresses a real-life production planning problem arising in a manufacturer of luxury goods. This problem can be modeled as a single item dynamic lot-sizing model with backlogging, outsourcing and inventory capacity. Setup cost is included in the production cost function, and the production level at each period is unbounded. The holding, backlogging and outsourcing cost functions are assumed to be linear. The backlogging level at each period is also limited. The goal is to satisfy all demands in the planning horizon at minimal total cost. We show that this problem can be solved in O(T4logT) time where T is the number of periods in the planning horizon.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.