Abstract

Permutation flow shop scheduling problem is a complicated global optimum problem. A number of intelligent algorithms have been used for this problem. In this paper, a plant growth simulation algorithm was used to solve permutation flow shop scheduling problem. The algorithm was experimented and the experimental results show that the Plant Growth Simulation Algorithm (PGSA)has better feasibility and validity for solving permutation flow shop scheduling problem.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call