Abstract

Construction industry reliance on performance metrics fixed at the project outset is being superseded by increasing use of emergent client judgments to characterize success. Clients may still consider a project that fails to meet formalized time, cost and performance goals successful if it satisfies emergent requirements not understood during initial briefing. Construction practitioners do not routinely recognize that client awareness of requirements improves as projects progress. Internal conflict among the client stakeholders and their reflections on the emerging project solution help client stakeholders to better understand their needs. Dissatisfaction results when these emergent requirements are not acknowledged. The need for practitioners to recognize and respond to these issues is explored by a paradigmatic case study of an office relocation and refurbishment project. The role of the ‘project sponsor’ as a synthesizer of client requirements and reflections on the emerging solution was observed to be subverted by stakeholders in a client body who found their emergent requirements were not acknowledged by construction practitioners. By characterizing the harmful effect of pluralistic client complexity and emergent requirements on perceptions of project success, the rationale for a revised project sponsor role to better address these influences on perceptions of project success is contributed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.