Abstract

Flexible manufacturing systems (FMS) have been taking a prominent place in production markets, but constant changes in production rates and product types force us to sort out constantly the scheduling problem that use to be NP-hard. Most commercial tools used to optimize FMS resources are analytical, and often limited to describing stationary relationships between FMS units. An object oriented simulation tool to prune the FMS Petri nets reachability tree is presented. This tool prunes the Petri net coverability tree using a heuristic algorithm, finding pseudo-optimal solutions for the FMS resource scheduling problem. The paper illustrates the usefulness of the tool to find a suitable batch size for a FMS example.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.