Abstract

A resource investment problem with discounted cash flows (RIPDCF) is a project-scheduling problem in which (a) the availability levels of the resources are considered decision variables and (b) the goal is to find a schedule such that the net present value of the project cash flows optimizes. In this paper, the RIPDCF in which the activities are subject to generalized precedence relations is first modeled. Then, a genetic algorithm (GA) is proposed to solve this model. In addition, design of experiments and response surface methodology are employed to both tune the GA parameters and to evaluate the performance of the proposed method in 240 test problems. The results of the performance analysis show that the efficiency of the proposed GA method is relatively well.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.