Abstract

We study the problem of non-preemptively scheduling $n$ jobs, each job $j$ with a release time $t_j$, a deadline $d_j$, and a processing time $p_j$, on $m$ parallel identical machines. Cieliebak et al. (2004) considered the two constraints $|d_j-t_j|\leq \lambda p_j$ and $|d_j-t_j|\leq p_j +\sigma$ and showed the problem to be NP-hard for any $\lambda>1$ and for any $\sigma\geq 2$. We complement their results by parameterized complexity studies: we show that, for any $\lambda>1$, the problem remains weakly NP-hard even for $m=2$ and strongly W[1]-hard parameterized by $m$. We present a pseudo-polynomial-time algorithm for constant $m$ and $\lambda$ and a fixed-parameter tractability result for the parameter $m$ combined with $\sigma$.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.