Abstract

The proposed hybrid parallel evolutionary method for Job Shop scheduling with parallel machines was verified by application in a steam turbine factory. The population diversity was improved, and premature elimination of reasonable evolutionary patterns could be avoided. The results indicated that the energy consumption was saved by using this method while the limits of time and costs were satisfied.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.