Abstract

Exponentially weighted moving average (EWMA) control charts for time-between-events (TBE) are commonly suggested to monitor high-quality processes for the early detection of process deteriorations. In this study, an enhanced one-sided EWMA TBE scheme is developed for rapid detection of increases or decreases in the process mean. The use of the truncation method helps to improve the sensitivity of the proposed scheme in the process mean detection. Moreover, by taking the effects of parameter estimation into account, the proposed scheme with estimated parameters is also investigated. Both the average run length (ARL) and standard deviation of run length (SDRL) performances of the proposed scheme with known and estimated parameters are studied using the Markov chain method, respectively. Furthermore, an optimal design procedure is developed for the recommended one-sided EWMA TBE chart based on ARL. Numerical results show that the proposed optimal one-sided EWMA TBE chart is more sensitive than the existing optimal one-sided exponential EWMA chart in monitoring both upward and downward mean shifts. Meanwhile, it also performs better than the existing comparative scheme in resisting the effect of parameter estimation. Finally, two illustrative examples are considered to show the implementation of the proposed scheme for simulated and real datasets.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.