Abstract

Ice jams in the Grasse River have caused the erosion of capping material designed to prevent the resurfacing of the bed sediment in the polychlorinated biphenyl (PCB)-contaminated area. Two in-stream ice-control structures are proposed to avoid the jam-induced erosion of the capping material. These two ice-control options are a pier-type ice-control structure and a reconstruction of a small hydropower dam upstream of the capping site. A numerical model study using the DynaRICE model is conducted to evaluate the effectiveness of the proposed design. Flow and ice conditions corresponding to the 100-year return period of ice jam events obtained from analyzing historical breakup ice jam data are used in the evaluation. The results showed that these ice-control structures could reduce the ice discharge downstream and the size of the ice jam at the capping site to prevent the erosion and scour of the PCB-contaminated bed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call