Abstract

With the continuous development and construction of the new power system, there would be a large number of renewable energy connected to the electric network in the future. And the uncertainty of renewable energy would have a greater impact on the power grid, such as excessively large investment and low utilization rate. In view of this, this paper fully considers the adjustable comprehensive resources of the power supply and the load side, and proposes a novel transmission network planning framework under the new power system. Further, from the aspects of economy and reliability, an evaluation system of novel transmission network planning framework is established. At last, taking a municipal 220 KV power grid as an example, the novel transmission network planning framework is applied, and the effectiveness of the proposed planning framework is verified.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.