Abstract

Transient process, an essential condition for the operation of the hydro-turbine governing system, is critical for the safety and stability of a hydropower station. This research focuses on the transient modeling and dynamic analysis of the hydro-turbine governing system in the start-up process. A novel approach is developed to establish the dynamic model of the hydro-turbine governing system in transient process. The flow equation and torque equation were improved to reflect the dramatic changes of system parameters during the start-up process. As a pioneering work, the effect of guide vane opening law on the dynamic characteristics of the hydro-turbine governing system in the start-up process was investigated by numerical simulations. The results of this research can promote the development of transient modeling and performance improvement of hydro-turbine governing systems in transient process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.