Abstract
Abstract The petroleum industry is performing extensive research into rectifying structural well integrity issues, mainly caused by migration of hydrocarbon fluids to surface through microchannels, due to poor cementation, resulting in the inability to provide integral barriers in the 9⅝″ casing × 12¼″ hole annulus. As a consequence, the well life can be extended and the older wells can be restored back to production and injection, resulting in long term fulfilling of the increasing global demand for additional energy requirement. Annulus-B Remediation using HydraWell Technology is one of the innovative approaches that can be utilized in wells to provide strong integral cement barriers behind the 9⅝″ production casing to prevent reservoir fluids migrating to surface. This approach is gaining increased popularity due to a number of economic and environmental advantages such as restoring the well production/injection with minimum workover costs and risk due to less complex operations, mitigate environmental concerns by avoiding excessive steel cuttings like section milling and eliminating the complexity associated to re-entry risk as incase of section milling. The research utilizes a novel technology to execute a repair of wells with failed Annulus-B barrier integrity by providing integral cement barriers in the 9⅝″ × 13⅜″ casing annulus above the reservoir for wells experiencing migration of hydrocarbons from reservoir through the 9⅝″ × 13⅜″ casing annulus. The planned methodology starts with completion recovery followed by running noise, temperature and cement bond logs in order to evaluate the cement quality behind 9⅝" casing above the reservoir. Findings from the noise/temperature logs and oil sample evaluation indicated that oil is migrating from the reservoir, through 9⅝″ × 13⅜″ casing annulus, dripping at surface through the 30″ conductor pipe. The cement bond logs indicate poor cement behind 9⅝″ casing above the reservoir. Therefore, Remediation technology was successfully utilized as it delivers effective jet washing and subsequent cleaning of the annular space using specialized tools and thereafter spraying cement to create a 100-feet competent cement barrier behind the casings for effective isolation and the prevention of pressure communication to the surface via Annulus-B. Furthermore, a 7″ short tie-back was installed over the perforated cemented interval. Hence, the 9⅝" casing was re-established as a well barrier element in the well, allowing the injection rate for the well to be restored. This strategy may be developed as a very cost effective technology as it saves the operator approximately 5-8 days per well with associated significant CAPEX and OPEX savings by avoiding additional costs associated with complexity of operations in section milling. It is feasible to be applied in offshore wells requiring remediation of failed Annulus-B integrity with reduced rig time and the associated costs with minimum environmental risk.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.