Abstract

<span>Risk management in software development has always been one of the necessities of software project management. The logical nature of software projects and products has caused several challenges and risks in these projects. On the other hand, with the emergence of Agile methodologies, especially Scrum, and extreme programming (XP) methodologies, in recent years, this issue has become more serious. This is mainly because emphasizing limited documentation in these methodologies has caused these methods to pay little attention to some aspects of project management, particularly risk management. Concentrating on this challenge, the current study has proposed a risk management model in the hybrid methodology, combining Scrum and XP. Using this model in a case study shows this model's success in achieving risk management purposes. The results of this study indicate an appropriate reduction in the number of reworks, change requests, identified risks, and occurred risks. Moreover, the number of eliminated risks and team productivity have increased.</span>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.