Abstract

To address the issue of resource co-allocation with constraints to budget and deadline in grid environments, a novel co-allocation model based on virtual resource agent was proposed. The model optimized resources deployment and price scheme through a three-side co-allocation mechanism, and applied queuing system to model the work of grid resources for providing quantitative deadline guarantees for grid applications. The validity and solutions of the model were presented theoretically. Extensive simulations were conducted to examine the effectiveness and the performance of the model by comparing with other co-allocation policies in terms of deadline violation rate, resource benefit and resource utilization. Experimental results show that compared with the three typical co-allocation policies, the proposed model can reduce the deadline violation rate to about 3.5% for the grid applications with constraints to budget and deadline. Also, the system benefits can be increased by about 30% compared with the those widely-used co-allocation policies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.