Abstract

In this paper a new predictive-reactive rescheduling method is presented based on the dynamic pegging concept. Scheduling adjustments in a multi-level, mixed-model production system are invoked in response to the unplanned events, such as new order arrival, changes in due dates, and order cancellation. By using the dynamic pegging approach at the time of rescheduling, Work-In-Progress (WIP) can be reassigned to the existing or new orders. Based on our previous work on reactive-only rescheduling with dynamic pegging, a Mixed Integer Programming (MIP) model is developed for predictive-reactive scheduling of new orders of different product types that arrive following exponential distribution. A simple example is designed to compare the performance of predictive-reactive rescheduling and the reactive-only rescheduling by changing different input parameters to the MIP model. The results indicate that in certain scenarios implementing the predictive-reactive approach could be significantly more cost-efficient.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.