Abstract

Prediction of the blast-induced is an important issue in Shur river dam, Iran. The nonlinear mathematical models can provide an appropriate flexibility to achieve the accurate predictions of the blast-induced airblast. In this paper, a set of nonlinear mathematical models with eight empirical relations, which are added based on the logarithmic and power basic functions, are selected to calibrate of the mine blasting airblast using two input variables, i.e. maximum charge per delay (MC) and distance from the blast-point (DI). A general regression analysis is proposed to calibrate the nonlinear models using a modified conjugate Fletcher and Reeves (FR) method using a limited scalar factor and dynamic step size to achieve the stabilization in nonlinear modeling. Finally, three simple empirical models are chosen to implement the prediction of the blast-induced airblast. The proposed empirical models were compared with the United States Bureau of Mines (USBM) model using several error statistics. The results indicate that the proposed modified FR model provides an appropriate calibration for the nonlinear regression analysis. Also, it was found that the empirical model proposed in this study, with the root mean square error (RMSE) of 3.79, is more accurate than USBM, with the RMSE of 4.22, and can be applied to other sites for predicting the airblast.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.