Abstract
The running time of high-speed train is generally not late, and it can run normally in most cases. However, when severe weather conditions, train components and equipment, accidents or emergencies occur, it will lead to train operation delay and traffic congestion. Therefore, when an accident occurs, we need to adjust the train time or route timely and accurately. As an important algebraic system, max-plus algebra is widely used in the field of industrial production control. In industrial production, the most production mode is the discrete system , but the characteristics and the ability of discrete systems depends on the periodic of system and the number of workpiece produced by the system in unit time, and the characteristics of the system are closely related to the properties of the matrix, especially, the eigenvalues and eigenvectors of the matrix in the sense of max-plus algebra. Therefore, this paper studies the max-plus algebra theory and the solution of eigenvalues and eigenvectors of matrices in the sense of max-plus algebra, establish the operation time matrix to optimize the train operation adjustment model of high-speed railway, and analyze the failure propagation model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Circuits, Systems and Signal Processing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.