Abstract

Secure and continuous power flow in the transmission line is one of the critical issues that must be rectified. In fact, rescheduling-based congestion management is considered to be one of the promising solutions for this aspect. Still, the model faces issues on the basis of rescheduling costs. More research works have been addressed so far to solve the problems of congestion management. Optimization algorithms also play a vital role in solving this problem. Under this scenario, this paper introduces a new rescheduling-based congestion management model that incorporates a new algorithm, refractor update-based ROA (RU-ROA) that optimizes the generating power of added generators with the bus system. The proposed RU-ROA algorithm is the hybridization of two algorithms, namely rider optimization algorithm (ROA) and water wave optimization (WWO), that aims to manage the congestion with the reduced cost of rescheduling. Further, the proposed model compares its performance over other conventional models like particle swarm optimization, FireFly, grey wolf optimization, traditional ROA and traditional WWO-based rescheduling strategy with respect to cost analysis and convergence analysis, and proves the efficiency of proposed work over others.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.