Abstract

With the increasing attention on environmental issues, green scheduling in manufacturing industries has become a hot research topic. As a typical scheduling problem, the flexible job-shop scheduling problem (FJSP) has received increasing attention, but research on the FJSP considering set-up and transportation times simultaneously is still rare. To address the energy-efficient FJSP with sequence-dependent set-up and transportation times to minimize makespan and total energy consumption, a multi-objective mixed-integer linear programming model of the problem is formulated and an effective novel heuristic method (NHM) is proposed. To enhance the convergence and distribution of the NHM, three strategies—population initialization, greedy iterative decoding and local intensification—are designed. The performance of the NHM is demonstrated by comparison with three algorithms through 48 instances. The results show that the NHM can obtain a scheduling scheme with lower makespan and total energy consumption than those of the comparison algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.