Abstract
Spatial resources such as slipway and erection platform are key and bottleneck resources for large equipment manufacturing enterprises, and restrict output and efficiency of enterprises. Spatial resource has several distinct features, such asspatiality,divisibility,adjacency,exclusivityandgroupcharacteristic. These features introduce great complexities into spatial Resource Constrained Project Scheduling Problem (sRCPSP), which lead sRCPSP very hard to model and solve. So a mathematical model for sRCPSP considered all features and other renewable resource constrains comprehensively has been established. Then an Activity Type Priority based Serial Scheduling heuristic method and a Resource-Time Block based Spatial Resource Allocation Method have been proposed to solve the model. Results of numerical experiments proved that those two algorithms are correct and effective.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.