Abstract

This letter presents strong novel evidence for the semi-permeable membrane surrounding Portland cement during the induction period. In the cement hydration, heat curve obtained through high-resolution differential scanning calorimetry under isothermal conditions, one main and some other smaller endothermic peaks were detected. These endothermic peaks are believed to be caused by the osmotic expansion that occurs after the semi-permeable membrane forms, not the precipitation of calcium hydroxide or the imbibition of water during the induction period.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.