Abstract

In this paper, we propose a novel construction project progress forecasting approach which combines the grey dynamic prediction model and the residual modified model to forecast the current progress during the construction phase. Firstly, four typical S-curves simplified from various sigmoid curves are proposed and fitted to the grey dynamic prediction model. For higher prediction accuracy, three different residual modified models are taken to amend the initial prediction value which was derived from the above step. The mean absolute percentage error (MAPE) and standard deviation of the estimate of Y (SDY) are used to assess the accuracy of the composite results. The better residual modified prediction model is adopted to combine the grey dynamic prediction model to form the novel progress forecasting approach. Then, practical completed construction cases are provided for testing the prediction ability of the proposed progress forecasting approach. Results show that the forecasting approach proposed to forecast construction progress during construction phase is able to get better prediction accuracy almost within 10% whether typical S-curves or practical cases. The new approach relatively provides an accurate, simple and stable method for predicting construction progress in comparison with the previous traditional forecasting methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.