Abstract
Recovering waste heat from the flue gas of coal-fired power plants and utilizing it reasonably is an effective way to increase power plant efficiency. The bypass flue process is an improved boiler cold-end optimisation process and has greater energy savings than the traditional low-temperature economizer process. To achieve better stepwise utilization of flue gas, a novel boiler cold-end optimisation system based on bypass flue was proposed in this study. In the proposed process, flue gas waste heat after the wet flue gas desulphurizer was recovered and used as the first-stage heat source to preheat the ambient air, resulting in less heat transfer in the air preheater and more flue gas flowing into the bypass flue. The thermodynamic and techno-economic performance of the novel process were calculated and compared with the bypass flue process, using data from a typical 1000 MW coal-fired power plant. The thermal economy results show that the net standard coal consumption rate of the proposed process could decrease by 5.38 g/(kW·h) compared with the original unit, a 1.76 g/(kW·h) greater reduction than the 3.62 g/(kW·h) of the bypass flue process. The techno-economic analysis results show that the net present value of the 15 years lifespan is 21.61 million USD compared with the original unit, and is 5.13 million USD more than the 16.48 million USD of the bypass flue process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.