Abstract

In scale-up biphasic leaching process of polymetallic concentrate, the ferric bioregeneration cycles were performed in 15.0L down flow packed bed reactor; whereas the chemical leaching cycles were done using the biogenerated ferric in an indigenously designed 10.0L stirred tank reactor. The consortium took 25cycles for proper biofilm formation. It showed highest iron oxidation rate (IOR) of 3908.21mg/L/h at 25thcycle under no polymetallic stress. Even under stressed conditions, it was 2650-558mg/L/h. Cu extractions were 86.63-46.51 and Zn extractions were 67.89-14.74% in 1st-4thcycle, respectively. The developed consortium exhibited 17-51times higher IOR compared to original wild type consortium. Extraction isotherm for zinc with 30% Cyanex® 301 indicated that a total of two stages are required for its complete extraction using the phase ratio of 2:1 at equilibrium pH 1.5, leaving behind Fe(II) in the raffinate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.