Abstract

Transmission lines play an important role in providing all participants the access to supply and demand in a competitive electricity market. Market size could be limited by the physical ability of transmission network to deliver electricity. Transmission line congestion as a primary indicator for transmission expansion planning has been investigated in this paper. The calculation on congestion cost under single side bid Poolco market is proposed and is defined as the social surplus difference between before the transmission line violation and after congestion. The generator's bidding price change is considered as a result of market factors in a deregulated electricity market. Finally, a numerical example is applied on IEEE Reliability Test Systems (RTS) for illustrating the essential features of the proposed congestion cost evaluation approach. The results are conducted using the well-known Monte-Carlo Simulation method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.