Abstract

In current scenario of software industry culture, an important and crucial task under project management is accurate estimation of effort which leads to successful project completion. A successfully completed project means that the project is developed within the planned budget and timeline which is mostly related to accurate effort estimation whereas inaccurate estimation of effort and cost results in failure of a project in context of delivery cost, time and other parameters. Most of the research has been proposed in the estimation of software projects using traditional frameworks. In recent years as there are technological advancements and there is a requirement of adaptation to technological changes, agile development methodology has attracted a lot of interest in research and development in software industries. The dynamic nature of agile requires development of various techniques which may be used for software cost and effort estimation. This paper deals with the study of few popular techniques and proposes a novel technique using ensemble of two techniques.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.