Abstract

In 1994 Tyler proposed a modification of the MAD in order to achieve the maximal possible finite sample breakdown point for the Stahel-Donoho estimator based upon the median and the modified MAD. A proof is not given, however, and as far as we know has not been published yet. Moreover there seems to be an error concerning the exact definition of the modified MAD which is needed to achieve this goal. For the sake of theoretical completeness and in order to correct this error we calculate the finite sample breakdown point of modifications of the MAD and point out which of these modifications lead to a Stahel-Donoho estimator with maximal finite sample breakdown point.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call