Abstract

Baker and Smith [J. Scheduling, 6, 7---16, 2003] introduced a new model of scheduling in which there are two or more distinct families of jobs pursuing different objectives. Their contributions include two polynomial-time dynamic programming recursions, respectively, for the single machine scheduling with two families of jobs to minimize a positive combination of total weighted completion time, or maximum lateness, of the first family of jobs and maximum lateness of the second family of jobs. Unfortunately, these dynamic programming recursions are incorrect. In this paper, we solve the same problems by an O(n1 n2(n1 + n2)) time algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.