Abstract

AbstractWe investigate the complexity of openshop scheduling problems. A number of variations of the shop with different objective functions have been surveyed. The problem of minimizing mean flow time in no-wait openshop as well as the problem of minimizing the number of late jobs for preemptive schedules are shown to be NP-hard An O(n log n) time algorithm for minimizing the total weighted number of late jobs in no-wait openshop is provided.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call