Abstract
This paper considers scheduling n jobs on one machine to minimize the expected weighted flowtime and the number of late jobs. The processing times of the jobs are independent random variables. The machine is subject to failure and repair where the uptimes are exponentially distributed. We find the optimal policies for the preemptive repeat model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Probability in the Engineering and Informational Sciences
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.