Abstract

In this note, we revisit two types of scheduling problem with weighted early/late work criteria and a common due date. For parallel identical machines environment, we present a dynamic programming approach running in pseudopolynomial time, to classify the considered problem into the set of binary NP-hard. We also propose an enumeration algorithm for comparison. For two-machine flow shop systems, we focus on a previous dynamic programming method, but with a more precise analysis, to improve the practical performance during its execution. For each model, we verify our studies through computational experiments, in which we show the advantages of our techniques, respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.