Abstract
Glock [2012. Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. International Journal of Production Economics 136, 37–44] recently presented an integrated inventory model where the lead time can be reduced by crashing the setup and transportation time, by increasing the production rate, or by decreasing the lot size. In this note, we introduce a more realistic lead time crashing cost and propose a modified integrated inventory model by adding the transportation time as a decision variable and assuming that there are two different safety stocks. Furthermore, we give some numerical examples to illustrate the advantages of the modified model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.