Abstract
In this paper, a lot scheduling problem on a single machine with indivisible orders is studied. The objective is to minimize the total completion time of all orders. We show that the problem is NP-hard in the strong sense. Then, a binary integer programming approach and four simple heuristics are proposed to solve the problem. The binary integer programming approach with running time limit is considered as one heuristic method. As compared to a lower bound, the average performances of the heuristic method are really good and better than those of the four simple heuristics.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.